NY Botanical Gardens Stone Mill
Restoration of this 1840 NYC Landmark has been completed. Repointing was performed matching the original materials in-kind, using custom Spec Joint 46L
lime mortar. Injection grouting utilized Pump-X53iL lime grout. Custom System 45 was used for limited patching. Michael Edison, ECI President and Chemical Engineer, provided on-site technical support.
|